ground or position double joints concept

English to Russian Tech/Engineering Construction / Civil Engineering
As mentioned above, for 2” and above piping the prefabrication ratio in process areas, is planned to be not less than 70%. This means for all on plot isometric drawings, 70% of the welds shall be done in the prefabrication shop, 30% in the field, partly on the ground and only the essential portion in erection. Preferably, the spools will be also assembled in modules reducing further the 30% of field welds. For interconnecting piping same concept will apply with different percentage, maximizing the *ground or position double joints concept*.

Спасибо.
Proposed translations (Russian)
3 см.
Change log

Nov 11, 2016 09:42: changed "Kudoz queue" from "In queue" to "Public"

Proposed translations

5 hrs
Selected

см.

с максимальным увеличением процентной доли двойных сварных швов, выполняемых на площадке или на месте монтажа
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Спасибо!"
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search