English term or phrase:
out of design
French translation:
hors développement / conception
Added to glossary by
FX Fraipont (X)
Dec 23, 2016 12:30
7 yrs ago
English term
out of design
English to French
Bus/Financial
Management
Contexte :
The Risk Assessment Report out of design is located in XXX
The Risk Analysis Report out of design will be reviewed and approved by XXX to ensure completeness and conformance to this Risk Management Plan.
Merci
The Risk Assessment Report out of design is located in XXX
The Risk Analysis Report out of design will be reviewed and approved by XXX to ensure completeness and conformance to this Risk Management Plan.
Merci
Proposed translations
(French)
Change log
Dec 28, 2016 08:14: FX Fraipont (X) Created KOG entry
Proposed translations
+3
3 hrs
Selected
hors développement / conception
"3.5 Risk management of activities after software development
Your QMS should have been structured to mitigate risks after design (eg: a delivery procedure to mitigate the risk of delivering the wrong version to a customer). However, some specific risks may arise from a new software or system and may deserve a separate risk analysis report.
A Risk Analysis Report out of design will be created and updated as necessary after software development. Risk linked to activities after software development will be evaluated in accordance with Risk Management Procedures, criteria for acceptability of Risk, Requirements for Review of Risk Management Activities.
The activities are:
Sales & Marketing,
Production,
Storage,
Delivery,
Installation,
Maintenance,
Un-installation,
Disposal,
Add yours …"
Search Results
Risk Management Plan Template - Software in Medical Devices
http://blog.cm-dm.com/public/Templates/risk-management-plan-...
Your QMS should have been structured to mitigate risks after design (eg: a delivery procedure to mitigate the risk of delivering the wrong version to a customer). However, some specific risks may arise from a new software or system and may deserve a separate risk analysis report.
A Risk Analysis Report out of design will be created and updated as necessary after software development. Risk linked to activities after software development will be evaluated in accordance with Risk Management Procedures, criteria for acceptability of Risk, Requirements for Review of Risk Management Activities.
The activities are:
Sales & Marketing,
Production,
Storage,
Delivery,
Installation,
Maintenance,
Un-installation,
Disposal,
Add yours …"
Search Results
Risk Management Plan Template - Software in Medical Devices
http://blog.cm-dm.com/public/Templates/risk-management-plan-...
Peer comment(s):
agree |
Tony M
: This reflects the way I have seen the source term used: risks arising within the design itself, and peripheral risks arising around (e.g.) the use of the product / system.
2 hrs
|
Thanks Tony!
|
|
agree |
Christiane Allen
2 hrs
|
Thanks!
|
|
agree |
Annie Rigler
17 hrs
|
Merci!
|
|
neutral |
B D Finch
: That seems to be a translation of "beyond design basis", which I think is different.
20 hrs
|
4 KudoZ points awarded for this answer.
Comment: "merci"
+1
2 hrs
en dehors de la conception des produits/projets
It is the opposite of 'In design' as defined below
The process of determining the probability of design flaws or engineering errors relating to a particular product or service affecting the cash flow, reputation, or other aspect of an organization. Design risk assessments help to identify and resolve potential problems before a product is manufactured and sold
The process of determining the probability of design flaws or engineering errors relating to a particular product or service affecting the cash flow, reputation, or other aspect of an organization. Design risk assessments help to identify and resolve potential problems before a product is manufactured and sold
Peer comment(s):
agree |
Tony M
: I think this is the right idea, though I'm unsure about the actual FR wording.
3 hrs
|
neutral |
Christiane Allen
: L'idée est bonne, mais la traduction laisse à désirer.
3 hrs
|
-1
3 hrs
analyse des risques préventive/prévisionnelle
analyse papier/crayon
Peer comment(s):
disagree |
Tony M
: ALL R.A. is this by definition; this misses out the key issue with the 'out of design' / 'in design' aspect.
2 hrs
|
3 hrs
la dernière mouture
la dernière mouture du rapport...
Peer comment(s):
agree |
GILLES MEUNIER
50 mins
|
Merci!
|
|
neutral |
Francois Boye
: any explanation?
59 mins
|
disagree |
Tony M
: It has a specific technical meaning here, it doesn't just mean 'once the design process is over'.
2 hrs
|
I agree! Thank you!
|
1 day 32 mins
après design/dimensionnement
https://tel.archives-ouvertes.fr/tel-00450032/document
de V Ozouf - 2009 - Cité 3 fois - Autres articles
25 janv. 2010 - Côté maîtrise de la conception, les outils d'analyse de risque ont été ...... technique » ; cette seconde analyse étant effectuée après design.
https://goo.gl/pLA0N8
"Etudes diverses sur les enceintes après dimensionnement et sur la durée de ... "
de V Ozouf - 2009 - Cité 3 fois - Autres articles
25 janv. 2010 - Côté maîtrise de la conception, les outils d'analyse de risque ont été ...... technique » ; cette seconde analyse étant effectuée après design.
https://goo.gl/pLA0N8
"Etudes diverses sur les enceintes après dimensionnement et sur la durée de ... "
2 days 1 hr
issu (provenant) du projet
-